The project included construction works, such as dismantling, construction of a modular wall system specially designed for classified areas of cleanrooms, with a frame suitable for the passage of electrical infrastructure, new internal windows of which four automatic doors, false ceiling and hermetic lighting system, conductive and antistatic flooring, as well as electrical and hydraulic works
View project details here