Renovation of In Vitro Fertilization Unit (IVF) at IASO Thessaly

Project Description

Client: Iasso Thessaly, in collaboration with the IVF Assisting Nature center

Construction Time: 11/2020 – 12/2020

Reconstruction of the embryology and andrology laboratories, renovation of the office spaces, sperm collection, central reception and other auxiliary spaces. The unit was redesigned according to the modern functional needs and extensive aesthetic upgrades were carried out with new materials, oil paintings and wallpapers.

The renovation of the embryology laboratory included the installation of a modular masonry system with HPL finish, medical gas column, smart glass (glazing system with optional transparency / opacity), automatic door, installation of antistatic floor, while it was upgraded to a clean space with Absolute filters and air shower installation upon entering the space.

The electrical installation includes a control system at the critical entrances, installation of an interlock at the entrance of the laboratory, while a stainless-steel box for the transfer of objects (interlock) between the laboratory and the embryo transfer area was installed.

The project was delivered on 30/12/2020.

Gallery

Share via:

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Share on whatsapp
WhatsApp
Share on email
Email