Eugenideio Hospital 3rd Inpatient Floor Renovation

Project Description

Renovation of the 3rd inpatient floor at Evgenideio Hospital “Agia Trias”. All necessary construction works were carried out, resulting in the creation of a modern healthcare facility of high standards.

The works were completed in 60 days and included:

  • Demolitions and dismantling
  • Drywall and partitioning
  • Wood paneling and tile cladding
  • Wall coverings with antimicrobial HPL
  • Suspended ceilings
  • Medical gas
  • External frames and internal doors
  • Stainless steel and PVC handrails
  • Wall protection strips
  • Painting, coatings, and plastering
  • Complete bathroom construction
  • Room furniture and equipment
  • Antimicrobial curtains
  • External window shading system