New Project- Replacement of an AHU @ New Life IVF, Thessaloniki

New Project- Replacement of an Air Handling Unit (AHU) at the embryological laboratory of New Life IVF, in Thessaloniki.

Project includes following works

  • Dismantling of the existing unit
  • AHU with direct expansion evaporator element (DX), resistors, filters, mixing box
  • External Unit VRV
  • Installation of a new unit on special levelling anti-vibration . Commissioning of the installation, operation setting, connection with sensors dP
  • Supply and installation of new inlet, return and discharge channels adapted to the new AHU
  • Electrical works of connection and power supply of the new AHU, cable routing rack and cooling pipes