Search
Close this search box.

Construction of clean room in the pharmaceutical cannabis production facility, King Field DOO, Ohrid, North Macedonia

Project Description

Client: King Field, Ohrid

Contractor: Consortium: AxisMedical

Total space area: 270m²

Year of Construction: 05/2020

Cannabis collection, cutting, drying and packaging areas, material warehouses, changing rooms and toilets.

The construction of clean rooms of medical cannabis laboratories in accordance with GMP standards Specifically, the rooms for collecting, cutting, drying and packaging of hemp were constructed and covered with antibacterial modular masonry system (VAELMA). The construction works included construction of false ceilings from mineral fiber cassettes, installation of internal wooden frames made of metal frame and antimicrobial paints. A completely new air conditioning system was  installed in the laboratory.

Gallery

Share via:

Facebook
Twitter
LinkedIn
WhatsApp
Email